We are slowly moving along with some delays caused by work not being scheduled.
As you can see from the photos that we have internal fit out, tiling and cabinetry being completed, still not lock up due to the sliding doors being a special order for this size house.
We saw today the alarm had been installed internally and the front door bell/chime.
I wonder how much more work they can do without needing to actually secure the house and stopping anyone entering and removing costly items.
It also seems they have run out of tiles and cannot complete the master bathroom.
Laundry after the correct tiles are layed
One of the many (5) bathrooms
Portico Facade
Dining and Kitchen
Downstairs rumpus
Theatre room
Office
Powder room
Kids bedroom
Kids bedroom
Kids bedroom
Upstairs rumpus
Master bedroom
Master bathroom
Wow house is looking nice!
ReplyDeleteWe are also building the Man 52!
Great to see some actual pictures!
Which tiles did you use in the master they look very similar to the marmo tile.
Did you make any structural changes? Extentions?
Since you now have a physical structure does it seem SD big as you thought lol.
What's you thought on the kitchen size :)
Good luck! Hope to see more pictures loving it so far!